Neoen Battery
Strengthening Ontario’s Power Grid
Call for Applications: Join the Neoen Battery Community Liaison Committee!
Apply Now!
Ontario’s electricity demand is forecast to almost double by 2050, and battery energy storage facilities represent one of the safest, cleanest and most cost competitive options to meet these growing capacity needs.
Neoen Battery is a standalone battery energy storage project proposed to store and discharge 400-megawatts (MW) of power directly to-and-from Ontario’s power grid – that’s enough capacity to supply power to 385,000 Ontario households during peak demand.
The proposed project is solely a battery storage development, not a data centre. Neoen makes an unequivocal commitment never to propose a data centre in Saugeen Shores.




Proposed Location
Following preliminary technical assessments and consultation with the Saugeen Ojibway Nation
(SON), local stakeholders, and the community, Neoen has selected Site C1 as its proposed
development site for Neoen Battery. Site C1 is located on 752 Concession Road 2, east of Highway
21, in the Town of Saugeen Shores. The site is approximately 5 kilometres south of Port Elgin.
Resources
Battery Energy Storage
Why Battery Storage?
Battery Energy Storage Systems (BESS) are a well-established and highly effective technology, with over 54 gigawatts of assets deployed across North America – equivalent to the total generating capacity of Italy. In Ontario, there are now 12 utility-scale assets in operation around the province, with 17 more under development. Batteries charge by storing extra energy from the electricity grid when demand is low (typically at night), and release the stored energy when demand is high (during the day), powering homes, farms, and businesses.
How It Works
Batteries charge by storing extra energy from the electricity grid when demand is low (typically at night), and release the stored energy when demand is high (during the day), powering homes, farms, and businesses.

Our Commitment to the Community
For local economy
Up to 200+ full-time jobs at peak construction, creating opportunities for local and Indigenous businesses
For the climate
Neoen Battery, with a capacity of 400 MW / 1,600 MWh, if fully charged and discharged once per day, could supply approximately 584,000 MWh annually. Each battery discharge (1,600 MWh) can power around 385,000 four-person households for 4 hours.
For your community
Neoen Battery will deliver benefits to local communities through a Community Benefit Fund, annual municipal tax contributions, and dedicated Rightsholder benefits
Project Lifecycle
Neoen is a global leader in clean energy, proud to be contributing to a strong Ontario.
Our commitment is simple:
- Safety first
- Listen well
- Share benefits
- Protect land and water
- Be a good neighbour
We know trust is earned, not given. That is why we focus on safety, reliability, and care for the local environment in everything we do.
Our goal is to work alongside the community, listen to concerns, and ensure our projects bring real benefits for Bruce County.
We have chosen to invest in Ontario because we see its potential and its commitment to a clean-energy future. Our goal is to contribute responsibly— delivering reliable energy solutions that create real benefits for local communities and support a stronger, more sustainable economy for everyone.
Ontario needs new electricity capacity to keep the grid reliable as demand grows significantly over the next 25 years. Batteries store electricity when it is available and return it to the grid when demand is higher, helping manage peak demand and make better use of existing generation and transmission infrastructure. Today, excess power generated at night is sometimes sent to the US – with batteries, this excess power can be stored for local use when it’s needed.
To meet this growing need, the Independent Electricity System Operator’s (IESO) competitively procured new capacity through its Long-Term 1 procurement. Neoen Battery was selected and awarded a 20-year contract for 400 MW.
Bruce County is well suited for battery storage because it is a major electricity-generation region with significant transmission infrastructure. The project must connect to the B27S/B28S 230 kV corridor at a location where Hydro One and the IESO determine that a 400 MW battery can be accommodated.
Neoen is a leading independent power producer of exclusively renewable energy, with 9.3 GW of capacity in operation or under construction across four continents, including over 4 GW of solar capacity worldwide as at the end of December 2025.
We are committed to sharing the benefits of our projects with the communities around them. By prioritizing both people and the environment, we have become a developer of choice and a pioneer in the renewable energy sector, focused on building lasting relationships wherever we operate.
Operating in Canada since 2022 with offices in Toronto and Calgary, Neoen has secured a portfolio capacity of 968 MW, including a 200 MW solar project co-owned by Garden River First Nation; a second 50 MW solar project co-owned by Matachewan First Nation; a 400 MW/4-hour battery storage project in the Traditional Territory of the Saugeen Ojibway Nation; Mino Giizis, a 157 MWp solar project in Saskatchewan, co-owned by Anishinabek Power Alliance; and Fox Coulée, a 93 MWp operating solar farm in Starland County, Alberta.